  The Brazilian experience with auctions for wind power: An assessment of project delays and potential mitigation measures

Bayer, B., Berthold, L., Moreno Rodrigo de Freitas, B. (2018): The Brazilian experience with auctions for wind power: An assessment of project delays and potential mitigation measures. - Energy Policy, 122, 97-117.
https://doi.org/10.1016/j.enpol.2018.07.004

Item is

Files

show Files

Locators

show

Creators

show
hide
 Creators:
Bayer, Benjamin1, Author              
Berthold, Lennart2, Author
Moreno Rodrigo de Freitas, Bruno2, Author
Affiliations:
1IASS Institute for Advanced Sustainability Studies Potsdam, ou_96022              
2External Organizations, ou_persistent22              

Content

show
hide
Free keywords: Wind power; Auction; Project delay; Implementation rate; Brazil
 Abstract: Renewable energy auctions are gaining popularity worldwide. However, practical experiences remain ambiguous. This holds especially true for on-time implementation rates. In Brazil, only 17% of the awarded capacity in the first ten auction rounds reached commercial operation within the set out deadline. In this article, we investigate the causes for these delays and discuss potential mitigation measures, based on expert interviews and extensive data analysis. The most severe delays were caused by expansion to the transmission grid. Delays in the supply of wind turbines also led to significant project setbacks. Other factors could be considered of minor relevance, but have led in individual cases to significant delays. These include factors related to project financing, project or environmental licenses, logistics, land-use conflicts and poor project management. Brazil effectively reduced delays caused by transmission grid expansion through amendments to the auction design. Our analysis also shows that options to further mitigate delays through an advanced auction design are limited, as they lead to conflicts with other energy policy objectives, e.g. local production of wind turbines, or because the delays are caused by factors beyond the control of the project developers.

Details

show
hide
Language(s):
 Dates: 2018-072018-11
 Publication Status: Finally published
 Pages: -
 Publishing info: -
 Table of Contents: -
 Rev. Type: -
 Degree: -

Event

show

Legal Case

show

Project information

show

Source 1

show
hide
Title: Energy Policy
Source Genre: Journal, E14, SSCI, Scopus
 Creator(s):
Affiliations:
Publ. Info: -
Pages: - Volume / Issue: 122 Sequence Number: - Start / End Page: 97 - 117 Identifier: CoNE: https://publications.rifs-potsdam.de/cone/journals/resource/140225g